Becorp Group
One-stop energy efficiency partner

Building Better. Enabling Sustainability.

Reduce Heat. Improve Efficiency.

The building envelope is where energy efficiency begins. Roofs, walls, windows and other parts of a building’s envelope influence how much heat enters and how hard cooling systems must work to maintain indoor comfort. At Becorp, we assess each building’s unique characteristics before recommending tailored solutions that help manage heat gain, optimise energy use and enhance overall building performance.

25+ yrs
Design and build
experience
7.5°C
Average indoor drop
in Malaysian buildings
2 weeks
To your savings
simulation report
3 years
Maintenance warranty
Becorp banner: a cool, airy modern home at sunset with airflow through the envelope
Becorp rope-access team repairing an external wall on Jalan Ampang
Glass tower against a grey sky
Cellulose fibre insulation exposed in a wall cavity between sound-absorbing acoustic panels
Empty warehouse with a steel roof structure
Rope-access workers on a tall external wall, Jalan Ampang
4°C
Our committed minimum temperature reduction after installation.
1°C ≈ 3–6%
Every 1°C less in cooling load can mean 3–6% energy savings on cooling.Indicative range. Actual savings depend on the building, its equipment and the climate.
Core strengths

Built around the building envelope.

From thermal insulation and reflective coatings to acoustic solutions and retrofit improvements, we focus on reducing heat gain, improving thermal comfort and helping buildings operate more efficiently.

Temperature icon

Thermal comfort

Heat is stopped at the roof, walls and glass. Our committed target is a minimum 4°C temperature reduction after installation.

Energy saving icon

Energy efficiency

Less heat coming in means less cooling to pay for. Consumption is metered before the work and again after it.

Acoustic icon

Acoustic comfort

One ceiling build-up brings the temperature and the echo down together.

Fire protection icon

Fire protection

Fire performance is part of the specification, so systems are chosen with building safety in mind.

Retrofit ready icon

Retrofit ready

Built for buildings that are already standing. Retrofits are prepared and installed in phases so downtime stays at the practical minimum.

Our latest USP
ESG icon

ESG ready

Before and after readings and reduction figures arrive formatted for your sustainability report and GBI submissions.

Assess. Audit. Identify. Design. Execute. Verify.

Six steps, in this order, on every project. Each one hands you something real: a reading, a report, a drawing, a fixed price.

01

Assess

We assess the building and recommend the solution. Surface temperatures are logged, bills reviewed and hot zones marked.

Half day on site
02

Audit

On-site measurement shows where your energy and heat actually go, and sets the baseline everything is measured against.

Baseline recorded
03

Identify

We pinpoint the roof, wall and glazing areas where heat enters, so the fix targets the cause and not the symptom.

Targeted scope
04

Design

Your baseline plus our product data produce the system design and a projected saving figure.

Report within 2 weeks
05

Execute

One team installs to the approved drawings. Retrofits go in phases so downtime stays at the practical minimum.

Fixed scope
06

Verify

Readings after installation confirm the drop you were promised. You keep both sets of readings.

Before and after data
Start where it hurts

Tick the sentences that sound like your building.

Owners arrive with one of these thirteen. Most of them share a cause, which is why a single survey answers the lot.

My electricity bill is too high.
My air-conditioning is working too hard.
My roof is absorbing too much heat.
My factory is too hot.
My workers are uncomfortable.
My production area has excessive noise.
I need to comply with new energy requirements.
My customer is asking for ESG evidence.
I need GBI or green-building requirements.
I need to demonstrate actual improvements.
I am refurbishing an old building.
I am designing a new facility.
My warehouse is difficult to maintain.

Why choose Becorp: fewer contractors, fewer excuses.

Delays, spec swaps and missing paperwork are the reasons upgrades go wrong. Each one has a fix built into how we work.

One team, start to finish

Design, supply and installation sit under one contract. The crew that quotes the job is the crew that does it.

No subcontractor swaps

Numbers, not adjectives

Surface temperature, energy consumption and sound levels get logged before and after. You keep both readings.

Verified performance

ESG reporting ready

Audit results and reduction figures come formatted for your sustainability report and compliance submissions.

EECA and GBI support

Specification held

Approved drawings decide what arrives on site. Materials are checked against the spec at delivery.

What you see is what you get

Qualified consultants

Projects above RM5 million bring in appointed architects, C&S engineers, designers and QS with credentials on file.

Scaled properly

Support after handover

Labour and materials are covered by a written warranty with a documented claims process. Sign up during 2026 and maintenance cover becomes a three year warranty.

After-sales included
Products & systems

Five systems that stop heat and noise.

Each one works alone. Together they form a three-layer envelope for Malaysian sun: coating on the outside, cellulose in the roof and walls, film on the glass.

Metal roof before and after Becorp heat-control coating
Layer 1 · Coating

Solar Heat-Control Coating

Reflective coating for metal and concrete roofs and external walls taking direct sun all day.

82.8% solar reflectance · 0.87 emittance · SRI 102.92 · nil VOC
Becorp applicator spraying cellulose insulation under a factory roof
Layer 2 · Insulation

Cellulose Fibre Insulation

Sprayed or blown into ceilings, soffits and cavities. The system most projects begin with, because it answers heat and echo at once.

0.0384 W/m·K · R-3.4 at 25 mm, R-7.4 at 50 mm · 80% or more recycled fibre
Office window with solar-control glazing film overlooking a city skyline
Layer 3 · Glazing

Glazing Solar-Control Film

Cuts solar gain through windows and curtain walls without going dark.

Grades for daylight, glare, privacy and facade appearance
Cellulose fibre insulation exposed in a wall cavity between sound-absorbing acoustic panels
Integrated

Thermal & Acoustic Systems

One build-up handling heat gain and echo in the same detail.

Thermal, acoustic and humidity demonstrations at the Experience Centre
Sprayed cellulose insulation across a ceiling soffit and ductwork
Envelope

Envelope Insulation Systems

Full envelope packages for factories, offices, halls and places of worship.

Coating, insulation and film specified as one system
Scroll for more systems →
Services & solutions

Six building performance services under one contract.

Book the full audit or begin with one roof. Either way you finish holding a figure you can put in front of someone.

01

Industrial Design & Build

Factory and warehouse builds designed around thermal load from the first sketch.

02

Energy Audit & Performance Assessment

On-site measurement showing where your energy and heat actually go.

03

Thermal & Acoustic Solutions

Heat and noise treated as one system instead of two separate trades.

04

Building Envelope Solutions

Roof, wall and glazing upgrades that stop heat at the boundary.

05

ESG & Carbon Reduction

Reduction work documented for reporting, financing, GBI and customer ESG requests.

06

Performance Verification

Readings after installation confirm the drop you were promised.

1°C ≈ 3 to 6%saving

Before adding more cooling capacity, look at the heat coming in.

Every 1°C less in cooling load can mean 3–6% energy savings on cooling. That is why we treat the roof and the envelope before anyone talks about bigger chillers.

Indicative range.
Actual savings depend on
the building, its equipment
and the local climate.
Field readings

Roof temperature readings taken on real jobs.

The same infrared thermometer, the same roof, before and after the coating went on. These photos come from Becorp’s own jobs. The figures beside them come from laboratory test sheets, and the notes under them say what each one depends on.

Infrared thermometer reading 66.6 degrees Celsius on an uncoated metal roof
Before · 66.6°C
Uncoated metal roof, 11 March, 11.02am
Infrared thermometer reading 35.1 degrees Celsius on the same roof after coating
After · 35.1°C
Same roof after coating, 11 May, 11.48am
Thermal camera image of a roof structure showing a 16.4 degree reduction
Thermal camera · −16.4°C
Roof underside after treatment
Thermometer readings inside a warehouse before and after coating, 60.5 and 34.4 degrees Celsius
Inside the warehouse · 60.5°C to 34.4°C
Underside of the roof sheet, 11 to 16 October 2019
Up to 30%
less energy used in industrial buildings, depending on how much insulation goes in, the building materials and the site.
82.8%
solar direct reflectance for the heat-control coating, with 0.87 thermal emittance and an average SRI of 102.92.
R-7.4
at 50 mm of cellulose fibre insulation, R-3.4 at 25 mm, thermal conductivity 0.0384 W/m·K.
80%+
recycled content in the cellulose fibre, with low embodied energy and on-site recovery of overspray.

Coating tested to ASTM C1549, C1371, E1980 and D3960. Cellulose figures from the Envirospray 300 technical data sheet. Final performance depends on certified system data, detailing and installation quality, which is why every project is measured against its own baseline.

Projects we have delivered.

Interior fit-outs, office refurbishments and external wall repairs from Becorp's own site records. Open any project to see the full set of photos.

Wisma Trax Lounge interior with bar counter, brick pillar and mesh screens
Interior design & build · 2018

Wisma Trax Lounge

8 photos
Cahaya Gold jewellery showroom with lit display counters and marble floor
Retail fit-out · 2024

The Trax, Cahaya Gold

7 photos
Ampang Pajaking Premium office lounge with linear lighting and glass partitions
Office fit-out

Ampang Pajaking Premium

8 photos
Three rope-access workers repairing a tall external wall on Jalan Ampang
External wall repair works · 2019

Jalan Ampang external wall

3 photos
Space Furniture showroom exterior in Bangsar at dusk
Showroom

Space Furniture, Bangsar

1 photo
CSR demonstration site

Pure Life Society, Jalan Puchong

One building at the Pure Life Society home in Taman Tan Yew Lai has been fitted with Becorp insulation as a CSR initiative. It stands as a live benchmark for indoor temperature reduction and the energy saved, and it can be visited.

Arrange a visit
Certificates & awards

Building standards we work to.

Compliance is part of the scope. The paperwork is built while the work happens, not chased afterwards.

EECA Compliance Support

Documentation for facilities crossing the Act’s 21,600 GJ annual threshold. In force since 1 January 2025.

GBI Submission Pack

Envelope performance data prepared in the form green-building assessors expect.

Verified Performance Records

Before and after data for temperature, consumption and sound levels.

Registered Energy Manager Review

Audit findings checked with registered energy professionals before issue.

Research & validation

Engineering meets academia.

Becorp collaborates with the Nanotechnology & Catalysis Research Centre (NANOCAT) at Universiti Malaya (UM) on roof coating, and works with the Institute of Tropical Forestry and Forest Products (INTROP) at Universiti Putra Malaysia (UPM). The exchange feeds material selection, test and verification planning, and the way each system is applied on site.

Group photo at the Institute for Advanced Studies, Universiti Malaya
UM
Universiti Malaya
Nanotechnology & Catalysis Research Centre (NANOCAT)
Group photo of seven people giving a thumbs up at the Institute of Tropical Forestry and Forest Products (INTROP), Universiti Putra Malaysia
UPM
Universiti Putra Malaysia
Institute of Tropical Forestry and Forest Products (INTROP)
Client feedback

Who we work with: owners, architects and ESG teams.

★★★★★

The report arrived on time and the numbers held after installation. Our afternoon shift finally works in a cooler plant.

OM
Operations Manager
Manufacturing, Selangor
★★★★★

I specify envelope work regularly. What was quoted is what got installed, which is rarer than it should be.

CA
Consulting Architect
Design practice, Kuala Lumpur
★★★★★

Their reduction data went straight into our ESG report. That saved my team a whole round of chasing documents.

EC
ESG Consultant
Advisory, Penang
Book an assessment

Ready to Improve Your Building Performance?

Talk to our team about thermal, acoustic and building-envelope solutions for your next project. Tell us the building type and your monthly spend, and we will say whether a site visit is worth your time before anyone drives out.

No 26G & 26-1, Medan 28, Jalan Klang Lama, 58200 Kuala Lumpur
Get directions
Request an assessment
We reply within one working day.

Free desktop review. On-site scope confirmed before any visit.