Energy audit: know where your energy and heat actually go.

BECORP assesses the building, coordinates the appropriate energy audit and turns the findings into practical, measurable improvements, so every decision starts from a baseline rather than an assumption.

One assessment, from walk-through to baseline.

An audit is only useful if it leads somewhere. BECORP assesses the building and its operating conditions, engages the appropriate registered energy professional where required, and carries the findings through to design and verification.

01

Site Assessment

Surface temperatures are logged, energy bills reviewed and hot zones marked, while objectives and constraints are defined with you.

02

Energy Audit Coordination

The appropriate registered energy professional is engaged where required, with audit scope confirmed for each project.

03

Heat-Gain Mapping

Roof, wall and glazing areas where heat enters are located, together with thermal bridges and acoustic concerns.

04

Baseline & Measurement Plan

Surface temperature, energy consumption and sound levels are recorded before work starts, so later readings have a fair reference.

05

Simulation & Savings Projection

Your baseline plus BECORP product data produce a projected saving figure, with the simulation report delivered within two weeks.

06

Practical Recommendations

Findings become a clear scope: which systems, in which order, and what evidence is needed for reporting and compliance.

Four places energy quietly leaks.

The audit follows heat from where it enters the building to where it is paid for.

Roof & Walls

Surface temperature and solar exposure of roofs and external walls.

Glazing

Solar heat entering through windows and glazed façades.

Cooling Demand

How much cooling the building needs to hold comfort, and how efficiently it is supplied.

Electricity Bills

Billing history reviewed against the way the building is actually operated.

From assessment to verification.

The audit is the second step of a six-step process, and the findings carry through to the last one.

01

Assess

Assess building and energy performance, and define objectives and constraints.

02

Audit

Engage the appropriate registered energy professional where required.

03

Identify

Locate heat-gain paths, thermal bridges and envelope opportunities.

04

Design

Set the measurement plan and a projected saving figure from your baseline.

05

Execute

Carry the findings into installed work under one accountable team.

06

Verify

Measure outcomes against the agreed baseline and method.

Scroll for more steps →

The most efficient energy is the energy you never need.

BECORP looks at avoidable demand first: roof and wall envelope, insulation, detailing and efficient systems. Only then is supply sized to the actual need.

The best order of work is specific to each project, and insulation and solar generation can work together.

Thermometer readings inside a warehouse before and after coating, 60.5 and 34.4 degrees Celsius

What a measured result looks like.

CSR DEMONSTRATION SITE

Pure Life Society, Jalan Puchong

One building at the Pure Life Society home in Taman Tan Yew Lai has been fitted with BECORP insulation as a CSR initiative, giving a live benchmark for indoor temperature reduction and the energy saved.

Industrial buildings

Energy reduction potential

Up to 30%
Depends on insulation, materials and site
Malaysian buildings

Average indoor drop

7.5°C
Project outcomes vary with the site
Simulation report

Time to your savings figure

2 weeks
After the site assessment

Built for the evidence reporting now asks for.

EECA 2024 Awareness

In force since 1 January 2025. Energy-consumer obligations apply at 21,600 GJ or more across 12 consecutive months, and applicability should be confirmed with qualified advisers.

Registered Energy Professionals

Audit findings are checked with registered energy professionals where required, before they are issued.

ESG & GBI Evidence

Reduction figures and before and after readings are formatted for sustainability reports and green-building submissions.

Labour & Materials Warranty

BECORP provides labour and materials warranty according to the applicable project contract and product documentation.

Not sure where your building loses energy?

Start with the building, its operating conditions and your last twelve months of electricity bills.

Talk to BECORP about a site assessment that ends with a baseline you can act on.