Building envelope solutions: coating first. Stop heat before it enters the building.
The envelope is a building’s first line of performance, and the solar heat-control coating is its first layer. BECORP coats roofs and external walls to reflect part of the sun’s energy, then adds cellulose insulation and glazing film as one system.
What’s in scope
Three layers, one envelope, starting with the coating.
Heat gets in through the roof, walls and glass. The coating works on the outer surface before heat is absorbed, the insulation slows what gets through, and the film controls the glazing.
01
Envelope Assessment
Roof, wall and glazing exposure is surveyed to see which heat-entry paths matter most.
02
Layer 1: Solar Heat-Control Coating
Applied as a liquid to metal, concrete or clay roofs and external walls, reflecting part of the solar energy and limiting surface heat absorption.
03
Layer 2: Cellulose Fibre Insulation
Reduces heat transfer through roofs, ceilings, walls and cavities, and fills irregular voids.
04
Layer 3: Glazing Solar-Control Film
Applied to existing glazing to manage solar heat, daylight, glare and privacy.
05
Detailing & Interfaces
Thermal bridges and the junctions between layers are specified together, so the system performs as one assembly.
06
Installation & Handover
Work follows the approved drawings, with materials checked against the specification at delivery.
Layer 1, by the numbers
The coating is tested, not just described.
Tested in accordance with ASTM standards C1549, C1371, E1980 and D3960. Final performance depends on certified system data, detailing and installation quality.
82.8% Solar Reflectance
Reflects part of the incident solar energy before it is absorbed.
0.87 Thermal Emittance
How readily the coated surface releases the heat it has absorbed.
SRI 102.92
The average Solar Reflectance Index, a combined measure of reflectance and emittance.
Nil VOC Result
An exterior liquid coating with a nil VOC result in testing.
How a project runs
From assessment to verification.
Performance is designed, installed and evidenced rather than assumed.
01
Assess
Survey roof, wall and glazing exposure against the project objectives.
02
Audit
Coordinate the appropriate energy assessment where required.
03
Identify
Locate the heat-entry paths: roof, walls, glass and thermal bridges.
04
Design
Specify coating, insulation and film as one system, with the evidence plan.
05
Execute
Supply and apply each layer to the approved drawings.
06
Verify
Measure surface temperatures and energy use against the baseline.
Scroll for more steps →
Water. Air. Energy.
The envelope comes first.
A well-designed envelope can reduce unwanted heat gain and cooling demand as part of an integrated strategy. BECORP reduces avoidable demand first, then sizes supply to the actual need.
The right sequence is project-specific, and insulation and solar generation can work together.
The same infrared thermometer, the same uncoated metal roof, before and after the coating went on: 66.6°C on 11 March at 11.02am, and 35.1°C on 11 May at 11.48am. These photos come from BECORP’s own jobs.