Building performance verification: readings that confirm the drop you were promised.

BECORP logs surface temperature, energy consumption and sound levels before and after the work, so performance is designed, installed and evidenced rather than assumed.

Evidence, not adjectives.

Verification approach, evidence requirements and professional roles are confirmed for each project, against an agreed baseline and method.

01

Agreed Baseline

Conditions before the work are recorded and agreed, so there is a fair reference to compare with.

02

Documented Method

Consistent conditions, a documented method and calibrated instruments, where applicable.

03

Surface Temperature

Infrared and thermal-camera readings of roofs, walls and ceilings before and after treatment.

04

Energy & Sound Readings

Energy consumption and sound levels are logged, not estimated.

05

Before & After Record

You keep both sets of readings, formatted for ESG reporting and compliance submissions.

06

Professional Review

Where required, findings are checked with registered energy professionals before they are issued.

No outcome claim without a test record.

Consistent conditions · documented method · calibrated instruments where applicable.

Thermal

A side-by-side heat-flow and thermal-camera view.

Acoustics

A controlled sound absorption and isolation demonstration.

Humidity & Moisture

Monitored response and detailing education.

Records on File

Before and after readings are kept on file for every project, not just the showcase ones.

From assessment to verification.

Performance is designed, installed and evidenced rather than assumed.

01

Assess

Record operating conditions and objectives before work starts.

02

Audit

Log baseline surface temperature, energy and sound readings.

03

Identify

Agree what will be measured, where and by which method.

04

Design

Fix the measurement plan and evidence requirements in the project scope.

05

Execute

Install to the approved drawings, keeping conditions comparable.

06

Verify

Take the after readings and issue the before and after record.

Scroll for more steps →

Experience performance. Don’t just talk about it.

Turn building performance into something clients can see, hear and experience. At the Experience Centre in Jalan Klang Lama, architects, developers and green-energy auditors interact with the systems first hand.

They see how different heat-entry paths are treated by coordinated layers, under documented test conditions.

Becorp Experience Center storefront at night with illuminated signage and the Becorp logo

Roof temperature readings taken on real jobs.

FIELD READING

Uncoated metal roof, before and after

The same infrared thermometer on the same roof: 66.6°C before the coating on 11 March at 11.02am, and 35.1°C after it on 11 May at 11.48am. The figure is on the screen, not in the sales copy.

Roof coating

Same roof, before and after

66.6°C to 35.1°C
Infrared thermometer readings, March and May
Thermal camera

Roof underside after treatment

−16.4°C
Thermal camera reading after treatment
Warehouse

Inside the roof sheet underside

60.5°C to 34.4°C
11 to 16 October 2019

Documentation is part of delivery.

Verified Performance Records

Before and after data for temperature, consumption and sound levels.

Registered Energy Manager Review

Audit findings are checked with registered energy professionals before issue.

Documented Claims Process

Warranty claims follow a documented process: notification, assessment, decision, rectification and a closure record.

Project Compliance

Applicable building, material, workplace and regulatory requirements are assessed according to the project scope.

Want proof before you commit?

Start with the building and the readings you want to see.

Talk to BECORP about a verification approach agreed up front, with evidence you can put in front of anyone.