Renovation and fit-out: existing spaces turned into functional, well-executed places.
Becorp renovates and fits out halls, shop-lots, churches and commercial interiors, from space planning and demolition to joinery, lighting, AV and handover. Renovation is also the easiest time to add heat and sound insulation.
What’s in scope
One renovation scope, one team.
Renovation has to work around an existing building, its structure and often its day-to-day use. Becorp plans the sequence, coordinates the trades and keeps disruption to a minimum, with specialist roles confirmed according to each project.
01
Survey & Space Planning
Existing conditions are surveyed and the layout is re-planned around how the space will be used.
02
Interior Redesign
Layouts, finishes, joinery and branding are designed and approved before work starts.
03
Demolition & Alterations
Strip-out, structural alterations and new works are sequenced to protect what stays.
04
Fit-Out & Custom Joinery
Partitions, ceilings, flooring, joinery and finishes are built to the approved design.
05
Lighting, AV & M&E
Lighting, AV, acoustic treatment and M&E services are coordinated against the programme so interfaces are resolved before installation.
06
Handover & Maintenance
Final inspection, documentation and handover, with ongoing building maintenance available afterwards.
Added value: heat & sound insulation
Renovation is the best moment to add insulation.
Ceilings, roofs and walls are often open during a renovation, which makes it the easiest time to add cellulose fibre insulation, heat-control coating or solar-control film. Becorp can design these into the scope as added value.
Roof & Wall Performance
Heat-control strategies for exposed roof and wall surfaces.
Insulation
Thermal and acoustic insulation selected around the building assembly and project requirements.
Glazing
Solar-control solutions for windows and glazed façades where appropriate.
Acoustic Performance
Material and system selection to support the acoustic needs of the space.
How a project runs
From assessment to verification.
Performance is designed, installed and evidenced rather than assumed.
01
Assess
Assess the building, operating conditions and project objectives.
02
Audit
Coordinate the appropriate technical or energy assessment where required.
03
Identify
Locate heat-gain paths, thermal bridges, acoustic concerns and envelope opportunities.
04
Design
Select the appropriate systems, interfaces, evidence requirements and measurement approach.
05
Execute
Supply, install and project-manage the work with disciplined quality controls.
06
Verify
Measure and verify outcomes where applicable against an agreed baseline and method.
Scroll for more steps →
Experience before specification
Experience building performance before committing to a system.
At Becorp’s Experience Centre in Jalan Klang Lama, architects, developers and green-energy professionals can interact with selected systems and compare how different heat-entry paths are treated.
Demonstrations may include thermal performance, acoustic behaviour and moisture-related detailing under documented test conditions.
A nationwide programme building pawn shops to one corporate identity: Pajaking across 45 branches and Ar-Rahnu across 18, with interior fit-out, branding, signage and M&E works.
Applicable building, material, workplace and regulatory requirements are assessed according to the project scope.
Performance Verification
Where applicable, project outcomes can be measured against an agreed baseline and documented method.
Labour & Materials Warranty
Becorp provides labour and materials warranty according to the applicable project contract and product documentation.
Energy & ESG Coordination
Where required, Becorp can coordinate building-performance work with appropriate registered energy professionals and project-specific evidence requirements.
Talk to us
Planning a renovation or fit-out?
Start with the existing space, how it will be used and what it needs to achieve.
Talk to Becorp about renovation and fit-out covering space planning, interiors, lighting, AV, handover and, where it helps, heat and sound insulation.